Head Office
117, Grand Trunk Road, Salkia Howrah-700013, Kolkata, India
For work involving cut idler tubes before bearing-housing installation, the Twin Head Idler Boring Machine offers a process-specific solution. Typical users include conveyor component plants and roller production lines, where concentric tube location and consistent end preparation is valuable. Twin heads support opposed or paired processing in one setup.
Shipping Information Usually dispatched With In business days
Used for machining conveyor idler tube ends for assembly, the Twin Head Idler Boring Machine addresses a distinct stage of industrial work. It accommodates cut idler tubes before bearing-housing installation and keeps setup, tool engagement, and job handling centred on that task.
Natural settings include conveyor component plants and roller production lines. There the machine may serve production, repair, preparation, assembly, finishing, or testing according to its title and the surrounding workflow.
In operation, it locates the roller shell and machines one or both end bores. The practical focus is concentric tube location and consistent end preparation. Correct workholding, tooling, supervision, and routine inspection remain important because results depend on the material and setup. Twin heads support opposed or paired processing in one setup.
Selection should follow the real workpiece, material, operation, production frequency, handling method, and available space. Exact performance data must come from the technical specification for the chosen Twin Head Idler Boring Machine.
Pathak is a Manufacturer, Supplier and Exporter offering this machine with application-based product guidance.
| Model | TLPTHIB |
| Production | 300-400 Pc/12 Hours |
| Pipe Length | 200-2200 mm |
| Pipe Diameter | 76-200 mm |